About Us

Jordan Textile Factory Heat Pipe Heat Recovery Roof Top Unit Project

Apr 15, 2026

Our company's heat pipe heat recovery roof top unit has successfully completed manufacturing and shipment, and has been officially delivered to a large textile factory in Jordan. It provides efficient, energy-saving, stable, and reliable heating and cooling solutions for local textile production scenarios, helping enterprises achieve green and low-carbon production.

Project Overview

The Jordan textile industry faces high thermal loads and significant energy consumption pressures in production environments, imposing stringent requirements on the heat recovery efficiency and dual cooling/heating performance of HVAC equipment. The delivered roof top unit project features core parameters precisely tailored to meet the production demands of textile factories:

• Cooling Capacity:368kW

• Heating Capacity:359kW 

• Refrigerant:R410C

• Voltage:3P-380V-50Hz

• Compressor: Copeland

Product Features

Equipped with an advanced heat pipe thermal recovery system, it enables efficient recovery of waste heat during production processes, significantly reducing energy consumption in air conditioning systems. The system can be directly installed on building rooftops, substantially shortening construction periods and lowering installation costs, while facilitating subsequent maintenance and ensuring long-term stable operation of the equipment.

Project Significance

Moving forward, we will continue to optimize the performance of heat recovery roof top unit and introduce more customized solutions tailored to diverse industry needs, enabling global clients to achieve efficient and energy-saving HVAC system upgrades.

Direct-expansion Air Handling Unit successfully delivered to Vietnam laboratory project